background image

 

E-

H

ub 2

.0 

G

et

ti

ng

 st

ar

te

d

— 

LOW VOLTAGE 

E-Hub 2.0

Getting started

•  Make existing installations smart 

without new components

•  Meters integration via digital and 

analog inputs 

•  Embedded interoperability  

with third party systems 

Summary of Contents for E-Hub 2.0

Page 1: ...Getting started LOW VOLTAGE E Hub 2 0 Getting started Make existing installations smart without new components Meters integration via digital and analog inputs Embedded interoperability with third par...

Page 2: ...1 E HUB 2 0 GETTING STARTED...

Page 3: ...claimer 05 E Hub 2 0 performance 05 Internet data traffic 05 Configuring the system 05 E Hub 2 0 Configuration 05 Field Device Configuration 06 Network Configuration 06 Laptop Configuration 07 Ekip Co...

Page 4: ...onnect 3 2 6 0 and above E Hub 2 0 E Hub 2 0 is an independent IoT gateway which can gather data from field devices as well as consumption of water gas etc and connect to the system to ABB AbilityTM c...

Page 5: ...g on the requirement Disclaimer It is the sole responsibility of the customer to provide and continuously ensure a secure con nection between the product and the customer network or any other network...

Page 6: ...via Modbus RS 485 Internet data traffic The estimated data traffic per connected device amounts to 4 GB per year Configuring the system The system configurations before provisioning consist of four s...

Page 7: ...rewall is disabled Laptop Ethernet Switch Ethernet Switch Internet cloud CMS 700 Open CTs on MCBs Emax Emax 2 Tmax T RS 485 1 2 TCP IP ETH 0 ETH 1 COM 0 COM 1 E Hub 2 0 must be provided with internet...

Page 8: ...d click on the Ethernet 0 tile Configure the parameters according to the network where ETH0 is connected for example you can force a static IP address 7 E HUB 2 0 GETTING STARTED Ekip Connect 3 Provis...

Page 9: ...Cellular Follow the next instructions if you want to connect the E Hub 2 0 to internet through the Cellular 3G 4G network Be sure that the E Hub 2 0 ETH0 port is not connected to any network via an e...

Page 10: ...that can be use by ABB technicians to help you in case of issues with the device Click apply and continue Before provisioning please be sure that the system time is correct E Hub 2 0 I O Settings Cli...

Page 11: ...o ensure that ABB Ability will work properly it is mandatory to follow these two steps to check whether the system and the device are configured in the right way System check Activate configuration se...

Page 12: ...es connected with Modbus RTU communication protocol Then press OK Select Start Discovery Once the E Hub 2 0 module has been found digit the 16 character password code that you can find printed on the...

Page 13: ...at least one Main or Generator device must be set inside a plant Once all the settings on each device have been completed Click on Add to ABB Ability You can add the devices to an existing plant or t...

Page 14: ...ts the EULA and renews the license Moreover he can edit and view everything inside ABB Ability If you are the owner of the plant please select Become Owner otherwise insert the email ad dress of the p...

Page 15: ...net browser and access the ABB Ability page From the home page you can access all the func tions and the plants for which you have access From each plant it is possible to browse to Set tings then Pro...

Page 16: ...ty webapp Select the plant then Devices Delete device This will remove the association of the devices and the E Hub 2 0 from a plant and make them available for a provisioning on a new plant During th...

Page 17: ...reserved Specifications subject to change without notice 1SDC200100B0201 REV B 12 2020 ABB SACE A division of ABB S p A L V Breakers Via Pescaria 5 24123 Bergamo Italy Phone 39 035 395 111 Fax 39 035...

Page 18: ...16...

Reviews: