Routing introduction
After the Feather Duster V2 is correctly installed on the robot, connect external
exhaust hose and electrical cables to make the Feather Duster V2 ready for
operation. The Feather Duster V2 is delivered with internal cabling fitted. To replace
internal cables, see
Replacing the cable chain on page 103
.
The electrical cables are combined with the air tube within a protection flexible
conduit. Exhaust hose and conduit are fixed at different locations on the robot to
minimize wearing during operation.
xx1800001591
Exhaust hose
A
Hose holder
B
Cabling
C
Cable clamp
D
Fixing plate
E
Support frame
F
Continues on next page
68
Product manual - Feather Duster V2
3HAX010000210 Revision: A
© Copyright 2018 ABB. All rights reserved.
3 Installation and commissioning
3.3.4 Connecting exhaust hose and cables
Continued
Summary of Contents for Feather Duster V2
Page 1: ...ROBOTICS Product manual Feather Duster V2 ...
Page 12: ...This page is intentionally left blank ...
Page 168: ...This page is intentionally left blank ...
Page 172: ...This page is intentionally left blank ...
Page 180: ...This page is intentionally left blank ...
Page 188: ...This page is intentionally left blank ...
Page 190: ......
Page 191: ......