Prior to transportation untreated surfaces may have been rust proofed with a layer
of oil or grease which was applied before packing. Wipe off any excess oil/grease
before installation using a lint free cloth.
xx1900000194
Example of absorption bags - in the electrical cabinet - that must be removed.
Assemble the vision tower
If the FlexLoader SC 6000 was shipped in a container, the vision tower has to be
assembled.
Use straps to lift the vision tower. The straps shall be fastened around the beams
inside the tower. See image below.
xx1900000196
Lifting of the vision tower
Continues on next page
Product manual - FlexLoader SC 6000
31
3HAC051768-001 Revision: D
© Copyright 2014-2020 ABB. All rights reserved.
3 Installation
3.2 Mechanical installation
Continued
Summary of Contents for FlexLoader SC 6000
Page 1: ...ROBOTICS Product manual FlexLoader SC 6000 ...
Page 8: ...This page is intentionally left blank ...
Page 12: ...This page is intentionally left blank ...
Page 78: ...This page is intentionally left blank ...
Page 172: ...This page is intentionally left blank ...
Page 174: ...This page is intentionally left blank ...
Page 176: ...This page is intentionally left blank ...
Page 178: ...This page is intentionally left blank ...
Page 182: ...This page is intentionally left blank ...
Page 184: ...This page is intentionally left blank ...
Page 186: ...This page is intentionally left blank ...
Page 192: ...This page is intentionally left blank ...
Page 224: ...This page is intentionally left blank ...
Page 283: ......