Note/Illustration
Action
xx1800001901
Insert the rod in the hole and start the rotation
and punching at 1000 rpm. The capsule brakes
and the rotating rod is mixing the melange.
11
xx1800001902
Hardening time before tightening depending on
the ambient temperature:
2 hours < 10°C ambient
1 hour < 20°C ambient
40 minutes > 20°C ambient.
12
xx1800001903
If necessary, refine the adjustment of the track
levelling using the M60 screws, and then tighten
the M16 notched nuts.
See
Geometric alignment of FlexTrack IRT 501
13
Continues on next page
74
Product manual - FlexTrack IRT501-66/66R/90/90R
3HAW050008590-001 Revision: C
© Copyright 20042018 ABB. All rights reserved.
2 Installation and commissioning
2.5.2 Recommendations for floor mounting
Continued
Summary of Contents for FlexTrack IRT501 Series
Page 1: ...ROBOTICS Product manual FlexTrack IRT501 66 66R 90 90R ...
Page 8: ...This page is intentionally left blank ...
Page 38: ...This page is intentionally left blank ...
Page 118: ...This page is intentionally left blank ...
Page 174: ...This page is intentionally left blank ...
Page 178: ...This page is intentionally left blank ...
Page 182: ...This page is intentionally left blank ...
Page 186: ...This page is intentionally left blank ...
Page 198: ...This page is intentionally left blank ...
Page 200: ...This page is intentionally left blank ...
Page 202: ......
Page 203: ......