76J Pneumatic Fulscope Recorder
OPERATION
13
3
OPERATION
3.1 PREPARING
RECORDER
FOR
OPERATION
1.
Pull pen lifter forward to raise pen off chart, Figure 7.
2.
Start chart drive as follows:
a.
Electric Chart Drive - Turn power on.
b.
Spring-Wound chart drive - Lift clamp in chart hub and remove chart. Wind clock
using key supplied with recorder, then replace chart.
3.
Check to see that edge of chart is engaged under retainer tabs.
4.
Lift clamp in chart hub and rotate chart until correct time line on chart is aligned with PEN
ARC reference on chart plate.
5.
Push clamp down to retain chart on hub at adjusted position.
6.
Prepare pen(s) as follows:
a.
V-type Pen - Fill each pen with Taylor recorder ink using dropper supplied with ink.
Do not fill pen completely because ink may absorb moisture and spill over.
* NOTE
When pen is new, a slight oil residue may prevent ink from flowing. Remove
residue by washing pen in an oil dissolving solvent.
b.
Fiber-Tip Pen - Remove cap from pen tip. Pen will begin to write when it touches
chart.
c.
Optional Reservoir Pen - Fill pen by following instructions supplied.
7. Push pen lifter inward to allow pen(s) to contact chart surface.
Recorder is now ready for operation.
Summary of Contents for Fulscope 76J Series Model C
Page 1: ...Fulscope 76J Series Model C Instructions Pneumatic Recorder ABB Instrumentation ...
Page 18: ...76J Pneumatic Fulscope Recorder OPERATION 14 Figure 7 Chart Plate and Chart Drive Components ...
Page 20: ...76J Pneumatic Fulscope Recorder OPERATION 16 ...
Page 34: ...76J Pneumatic Fulscope Recorder MAINTENANCE 30 ...
Page 39: ...76J Pneumatic Fulscope Recorder PARTS LIST 35 Figure 23 Two Pen Movement 93S115 ...
Page 40: ...76J Pneumatic Fulscope Recorder PARTS LIST 36 Figure 24 Three Pen Movement 93S99 ...
Page 52: ......