Page 26
© Copyright 2021 ABB. All rights reserved.
ED83311
-
30 G211
-
213 (5000A);
G201
-
203 (10,000A)
Note:
These systems may have either one or two Load Type shunts monitored directly off the M2
controller (both at the same bus potential) or can have numerous Load Type shunts summed
together using BIC (Bay Interface Card) or PIC (Panel Interface Card
-
used with H569
-
534 DC
Busway applications) shunt channels. Shunts monitored directly by the M2 controller use no
CLRs (Current Limiting Resistors), while shunts monitored by BIC or PIC shunt channels must
include CLRs in the monitoring path. Refer to Section 6 for details.
Note:
The batteries and rectifiers are all connected to a common bus in this power system
configuration. The plant’s total load is determined by the system controller from the readings
taken from the single system current shunt located in the common bus.
Some of the common Centralized Architecture chandelier options where the rectifiers, batteries, and
distribution cabling are all routed through include the following:
J85504A1 L5 (1300A); L5 & LG (2600A)
J85504A1 L15 (2600A); L15 & Q (5200A);
L20 (5200A Horizontal Buses)
ED83019
-
50 G23 (10,000A);
G26 (10,000A w/15,000A Shunt)
Centralized Architecture
(continued)