background image

Power Break® II Devices 

Draw-Out Device Installation 

Installing the Device 

Use  the  following procedure  to  install the  draw-out  device 
into the substructure. 

Attach  the  Lifting  Bar,  catalog  number  TDOLB,  by 
locating  the  hooks  on  the  bar  beneath  the  shoulder 
studs of the device, as illustrated in Figures 4 and 5.
Pull  out  the  substructure rails  until  they  drop  into  the 
horizontal locked position. Lower the device so that the 
grooves in the rollers drop over the rails.
Make sure the grooves in all rollers straddle the rails, as 
illustrated in Figure 6, then remove the Lifting Bar and 
push the device into the substructure until it stops in the 
DISCONNECTED  position.  Then  lift  the  rails  and  push  
them in to the stored  position.

CAUTION: 

 The  device  must be

 

OFF before it is connected. 

If the device is charged, press the ON  button to close the 
device  contacts,  then  press  the  OFF  button  to  open 
the contacts. 

Engage the   1/2 -  inch square end of the racking shaft 
with the supplied wrench, catalog number TDORT, and 
rotate the  shaft clockwise to  draw  the  device into  the 
TEST or CONNECTED position, as illustrated in Figure 7. 
The compartment position indicator is shown in Figure 
8.

NOTE:

  If  the  device does  not  fit  the  structure, check  the 

rejection relationship, illustrated in Figure 8, to verify that a 
correctly rated  device  is  being  installed. Table  1  lists  the 
correct draw-out substructure for each device frame. 

NOTE:

  Si  le  mécanisme  ne  rentre  pas  dans  le  berceau, 

vérifier  le  détrompeur  illustré  dans  les  figure  8,  qui 
empêche l’insertion d’un mauvais calibre de mécanisme. La 
Table  1  définis  le  berceau  convenable  à  chaque  taille  de 
mécanisme. 


Figure 4. Lifting Bar attached to a draw-out device for manual lifting. 


Figure 5. Lifting Bar attached to a draw-out device for lifting with a hoist. 

Pipe

Lifting Bar

Shoulder 

Stud

ATTENTION: 

Le mécanisme doit être à OFF avant qu’il ne 

soit embroché. Si  le  ressort de  fermeture de  mécanisme 
est chargé, fermer les contacts de mécanisme par action 
sur  le  bouton  ON,  puis  appuyer sur  le  bouton  OFF  pour 
ouvrir les contacts. 

3

 

1.

2.

3.

4

.

Summary of Contents for GE Power Break II GEH6271

Page 1: ...GEH6271 INSTALLATION INSTRUCTIONS Power Break II Devices Draw Out 800 4000 Ampere Frames ...

Page 2: ...ble at the time of its publication While efforts have been made to ensure accuracy the information contained herein does not cover all details or variations in hardware and software nor does it provide for every possible contingency in connection with installation operation and maintenance Features may be described herein that are not present in all hardware and software systems ABB Industrial Sys...

Page 3: ...iftingBar attachedto a draw out devicefor liftingwith a hoist 3 6 Deviceinstalledon rails ready to be pushed into the substructure 4 7 Wrench attachedto the devicerackingshaft 4 8 Compartmentpositionindicatoron the front of the device 4 9 Withdrawingthe substructurerails 5 10 Rotatingthe deviceforward for inspection 5 List of Tables 1 Catalognumbers of draw out circuitbreakersand correspondingsubs...

Page 4: ...ustrated in Figures 1 2 and 3 PrimaryDisconnects Primary power is fed through multiple finger primary disconnects when the device is in the connected position Secondary Disconnects Control power is provided through the secondary disconnects in the test and connected positions only All accessories terminate at dedicated positions regardless of the combination of accessories installed Rollers The ro...

Page 5: ...and standards require that conductors be sized to the substructure Therefore installing devices in substructures with higher ratings is possible but not economical Draw Out Padlock Accessory When a padlock is installed this feature works with the racking shaft lockout plate to prevent engagement of the racking shaft wrench Shutter Actuator A stud actuates the optional shutter accessory By Pass Swi...

Page 6: ... end of the racking shaft with the supplied wrench catalog number TDORT and rotate the shaft clockwise to draw the device into the TEST or CONNECTED position as illustrated in Figure 7 The compartment position indicator is shown in Figure 8 NOTE If the device does not fit the structure check the rejection relationship illustratedin Figure 8 to verifythat a correctly rated device is being installed...

Page 7: ...rails ready to be pushed into the substructure Figure 7 Wrench attached to the device racking shaft Figure 8 Compartment position indicator on the front of the device Racking Tool Substructure Rejection Feature 06 in minimum Device Rejection Feature Compartment Position Indicator 4 ...

Page 8: ...EST or DISCONNECTED position The compartment position indicator is shown in Figure 8 Pull the substructure rails out as far as possible until they drop into the horizontal locked position as illustrated in Figure 9 From the DISCONNECTED position pull the device out on the rails until the front rollers fall into the detent as illustrated in Figure 6 The device can now be rotated about the front rol...

Page 9: ...ed grease Check primary and secondary disconnecting surfaces for signs of abnormal wear or overheating If required clean contacts with a suitable solvent Discoloration of silvered surfaces is not harmful unless atmospheric conditions cause deposits such as sulfides on the contact surfaces Check to see that all anchor bolts and structure bolts are tight Inspect all cable or bus connectionsfor signs...

Page 10: ...hall prevail ABB Inc does not accept any responsibility whatsoever for potential errors or possible lack of information in this document We reserve all rights in this document and in the subject matter and illustrations contained therein Any reproduction or utilization of its contents in whole or in parts is forbidden without prior written consent of ABB Inc Copyright 2019 ABB All rights reserved ...