Power Break® II Devices
Draw-Out Device Installation
—
Figure 6. Device installed on rails, ready to be pushed into the substructure.
—
Figure 7. Wrench attached to the device racking shaft.
—
Figure 8. Compartment position indicator on the front of the device.
Racking Tool
Substructure
Rejection
Feature
.06 in
minimum
Device
Rejection
Feature
Compartment
Position
Indicator
4