Installation and maintenance guide
1ZSC000563-AAB EN, REV. 6, 2019-09-12
21
2.
Attach soft lifting slings (8) from the lifting eye to
the crane hook.
G005137
3.
For installation at a specific angle: attach soft
lifting slings with a schackle (9) from the
intermediate flange to the crane hook.
G005105
End of instruction
Summary of Contents for GSBK 170
Page 46: ...46 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 52: ...52 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 54: ...54 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 62: ...62 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 66: ...66 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 70: ......
Page 71: ......