26
Installation and maintenance guide
1ZSC000563-AAB EN, REV. 6, 2019-09-12
11.
Install the end shield:
1.
Push the end shield carefully against the
pressing ring (17).
2.
Turn the end shield approximately 20°, to its
locked position.
G006213
12.
If the transformer will be oil-filled with the
atmospheric process:
1.
Remove the hex screws (6).
2.
Put the blades of two screwdrivers in the
recesses (19) in the outer terminal (5), and
carefully push them down to lift the outer
terminal (5) straight up.
CAUTION!
Do not cause damage to the shield
(18).
G006307
13.
The bushing is ready for oil-filling of the transformer, refer to
Oil-filling,
page
End of instruction
Summary of Contents for GSBK 170
Page 46: ...46 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 52: ...52 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 54: ...54 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 62: ...62 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 66: ...66 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 70: ......
Page 71: ......