28
Installation and maintenance guide
1ZSC000563-AAB EN, REV. 6, 2019-09-12
4.
Install the lifting eye (1).
G005127
End of instruction
4.4.2 Removal of the lower draw rod with bottom contact from the bushing
Overview
The bottom contact is usually installed in the bushing when it is delivered from ABB, the first step at the
transformer factory is thus to remove it.
G005090
1
Upper draw rod
2
Lower draw rod with bottom contact
3
Bottom contact
4
Bushing
Summary of Contents for GSBK 170
Page 46: ...46 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 52: ...52 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 54: ...54 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 62: ...62 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 66: ...66 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 70: ......
Page 71: ......