34
Installation and maintenance guide
1ZSC000563-AAB EN, REV. 6, 2019-09-12
Procedure
1.
Connect the upper draw-rod (1) to the lower
draw-rod (4).
G004932
2.
Hold the pull-through cord (12) in tension, while
lowering the bushing onto the transformer.
CAUTION!
Do not damage the stud bolts. There is
a risk of metal falling into the
transformer.
NOTE!
Plastic sleeves put on two or three of
the stud bolts will help to guide the
flange, and will prevent damage to the
stud bolts.
G005100
3.
When installing the bushing at the transformer
factory:
1.
Make sure that the bushing is installed in the
correct orientation.
2.
Make permanent markings (16) on the
bushing flange and the transformer turret.
G005107
Summary of Contents for GSBK 170
Page 46: ...46 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 52: ...52 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 54: ...54 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 62: ...62 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 66: ...66 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 70: ......
Page 71: ......