60
Installation and maintenance guide
1ZSC000563-AAB EN, REV. 6, 2019-09-12
7.3 Re-packing of the bushing
Overview
G005083
Procedure
1.
For storage <6 months: wrap the bushing in the original protective wrapping, and replace the drying
agent.
2.
For storage >6 months: install the transport
container (1):
1.
Replace the drying agent in the transport
container (1).
2.
Install the gasket (2).
3.
Carefully put the transport container on the
bushing, and install the bolts.
CAUTION!
Make sure that the transport container
does not cause damage to the
condenser core.
NOTE!
The transport container has to be
ordered separately.
G005121
Torque
50 Nm
3.
Lift the bushing. Refer to
Lifting the bushing out of the transport box,
page
Summary of Contents for GSBK 170
Page 46: ...46 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 52: ...52 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 54: ...54 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 62: ...62 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 66: ...66 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 70: ......
Page 71: ......