56
Installation and maintenance guide
1ZSC000563-AAB EN, REV. 6, 2019-09-12
4.
Remove the bolts and washers.
G005108
5.
Carefully lift the bushing from the transformer.
CAUTION!
Do not cause damage to the stud bolts, there is a risk of metal falling into the transformer.
6.
Install the transport cover (13) on the transformer
turret (11).
G004559
7.
Lower the bushing to the floor.
CAUTION!
Make sure that there is soft bedding, or support blocks on the floor.
End of instruction
7.2 Removal of the bushing from the transformer, draw rod
Procedure
1.
Install the lifting tool, refer to
Installation of lifting tools,
page
Summary of Contents for GSBK 170
Page 46: ...46 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 52: ...52 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 54: ...54 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 62: ...62 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 66: ...66 Installation and maintenance guide 1ZSC000563 AAB EN REV 6 2019 09 12 ...
Page 70: ......
Page 71: ......