SF GAS REFILLING EQUIPMENT
6
Sr. No.
ITEM DESCRIPTION
PART No.
1
Gas cylinder S 194-5600-103-17
supplied in 10 kg or 25 kg
cylinder.
2
Regulator
a) cylinder pressure gauge
b) outlet pressure gauge
c) reducing valve
IN 6821 0001 - 1
3
Pressure House
IN 2515 0001 - 1
4
Gas filling valve ‘OR’ Snap connection
IN 2529 0001 - 7
5
Connecting nipple
IN 2529 0001 - 8
IN 2529 0001 - 9
IN 2529 0001 - 5
6
Refilling unit with density switch
IN 5428 0001 - 5
without density switch
IN 5428 0001 - 6
with pressure switch
1VYN 400 201 - AY
1.3.3 Control of gas pressure (only for poles without pressure gauge / Pressure switch)
1. Close metering pressure valve
2. Connect metering pressure gauge to pole.
3. Read pressure compensation for temperature as shown on page 14. If reading
Is between 2.0 and 2.5 disconnect gauge.
4. Disconnect the operating device by disconnecting the voltage to the motor
and operate by hand “close” and “open”.
5. Close cylinder reducer valve.
6. Close charging valve.
7. Open cylinder main valve, and note reading on gauge (should show approx.
70 bar for full cylinder).
8. Open the reducer valve until a reading of 2.5 bar pressure is registered.
(If the reading is too high, close reducer valve and release gas by opening
charging valve with hose disconnected).
9. Open charging valve a little so that the gas leaks a little, thereby emptying
Hose of any air.
10. With the use of the snap connection, connect the hose to the metering tube.
11. Open the metering pressure valve.
(15)
Summary of Contents for HPA 12kV
Page 7: ...Fig 3b HPA breaker pole for 36 kV ...
Page 9: ... 7 Fig 5 Circuit Breaker ...
Page 13: ...Fig 7A Maintenance schedule for frequently operated breaker type HPA 1VYN400290 005 11 ...
Page 14: ...Fig 7B Maintenance schedule for frequently operated breaker type HPA 1VYN400290 005 12 ...
Page 15: ...Electrical endurance HPA 13 ...
Page 29: ......