Operation Manual / 4 Product description / A130-M.. - A145-M..
3
Commissioning
Page 27 / 121
© Copyright 2017 ABB. All rights reserved.
HZTL4031_EN
Revision E
January 2017
3.3
Commissioning after taking out of operation
If present
Remove cover plates (blind flanges) from the compressor casing, the gas inlet and the gas
outlet.
Remove the screw plugs on the water connections and fit the water pipe.
Version with compressor wheel cooling:
Remove the screw plug on the cooling air connection and fit the cooling air line.
General
Check the exhaust gas pipe before and after the turbine for combustion residues or water
residues and clean it. Remove any foreign objects that may be present.
Check and clean filter silencer or air supply line, and remove any foreign objects that may
be present.
Put engine-side oil circulation to the turbocharger into operation.
Prepare the turbocharger for operation according to section "Checks before commission-
ing".
The turbocharger is now ready for operation.