Operation Manual / TPL65-A32 / -A33 / -A36 + TPL69-A32 / -A33
Maintenance
5
Cleaning components mechanically
5.5
Page 67
© Copyright 2016 ABB. All rights reserved.
N
ov
em
ber
2016
H
ZT
L2498_
EN
R
ev
is
ion
B
1. Suspend cartridge group from normal suspension point and suspend
from first crane.
2. Secure two lifting loops with swivel lifting eyes in the lower push-off
threads and suspend from a second crane.
3. Rotate cartridge group horizontally by lifting the second crane.
4. When the cartridge group is horizontal, secure one chain block from
one of the upper push-off threads using a swivel lifting eye and sus-
pend from the second crane.
5. Tighten chain block until entire cartridge group is suspended from
second crane.
6. Remove loop from first crane.