Operation Manual / TPL76-C
5 Maintenance / 5.4 Cleaning turbine blades and nozzle ring in opera-
tion
© Copyright 2017 . All rights reserved.
HZTL2485_EN
Revision E
July 2017
Layout of cleaning pipes
Wet cleaning procedure for turbine during operation
u
Meet prerequisites and operating state requirements without fail be-
fore cleaning!
u
Make sure water supply (01) is connected, turned on and guaranteed.
u
Open drain pipe (08, 09), if provided.
u
Switch over 3-way valve (04) from scavenging air mode to water sup-
ply.
u
Set the required volume of water on the flowmeter as shown in the
table (see table Cleaning parameters).
u
Shut off the water supply again by switching the 3-way valve (04) to
scavenging air mode after injecting the required volume of water.
u
The injection process has been completed.
u
Close drain hole (if provided) above drain pipe (08, 09).
u
After cleaning, wait with engine running for at least 10 minutes
without changing load to allow turbocharger to dry.
Page
58
/
133