Operation Manual / TPS44-F.. - TPS61-F..
Start-up
3
Commissioning after taking out of
operation
3.3
Page 41
© Copyright 2016 ABB. All rights reserved.
A
ug
us
t2
01
7
H
ZT
L2
41
2_
E
N
R
ev
is
io
n
F
Commissioning after taking out of operation
3.3
τ
Remove cover plates (blind flanges) between compressor casing out-
let and charge air duct, before gas inlet and after gas outlet.
τ
Inspect exhaust gas duct / line in front of and after turbine for any
combustion deposits, foreign matter or residual water. Clean and re-
move.
τ
Inspect air supply line or filter silencer for any foreign matter. Clean
and remove.
τ
Start up turbocharger oil circulation system at engine end.
τ
Prepare turbocharger for operation as instructed in section "Inspection
work before start-up / commissioning" of chapter headed "Start-up /
commissioning".
τ
Start up turbocharger.
3.3
If provided