Operation Manual / TPL65-A32 / -A33 / -A36 + TPL69-A32 / -A33
5 Maintenance / 5.3 Cleaning the compressor during operation
© Copyright 2019 . All rights reserved.
HZTL2498_EN
Rev.D
August 2019
u
Push the valve activator (Y) against the spring and hold it for 10 ... 15
seconds until the entire volume of water has been injected.
u
After cleaning, wait at least 5 minutes to allow turbocharger to dry.
NOTICE
If the cleaning operation is not satisfactory, it may be repeated up to
two times.
If the cleaning result is still not satisfactory after three attempts and
the engine values are also unsatisfactory, we recommend that you have
the turbocharger inspected and cleaned by an official ABB Turbochar-
ging Service Station.
Cleaning parameters per turbocharger compressor
Product
Engine load
Contents of water vessel
[dm
3
]
TPL65-A32/33/36
50 … 85%
0.4
TPL69-A32/33
0.4 or 1.0
Page
52
/
118