Operation Manual / TPL67-C.. - TPL71-C..
2 Safety / 2.6 Safe operation and maintenance
© Copyright 2018 . All rights reserved.
HZTL2488_EN
Revision E
August 2018
Safety during start-up / commissioning and operation
u
Before starting work, carry out visual inspection of working area.
u
Remove any obstacles and objects lying around.
u
Before start-up / commissioning, check all pipes from and to tur-
bocharger for damage and leaks.
u
Don't work in any way that could impair safety when working on tur-
bocharger.
u
After about every 12 hours of operation or at least once a day, inspect
turbocharger for visible damage and defects.
u
Immediately report any damage or changes in operational perform-
ance to person responsible.
u
If damage is discovered, immediately shut down turbocharger and se-
cure it against inadvertent or unauthorized use.
u
When switching on auxiliary power sources (hydraulics, pneumatics,
electricity, water), keep an eye open for any hazards resulting from
supplying these power sources.
Safety during cleaning
If cleaning agents or solvents are used for cleaning, the corresponding
material safety data sheet and the safety instructions in section "Haz-
ards due to operating and auxiliary materials" must be observed.
u
Observe the material safety data sheet for the cleaning agent or
solvent.
u
Wear personal protective equipment (PPE) according to the material
safety data sheet.
u
Inspect the electric cables for abrasion and damage before and after
your cleaning work.
Page
19
/
125