Operation Manual / A150-M58/68
10 Dismantling and fitting with removed air inlet and gas outlet /
10.19 Installing the gas outlet casing
© Copyright 2021 ABB. All rights reserved.
HZTL4041_EN
Rev.E
January 2021
10.19
Installing the gas outlet casing
Variant without support
Fig. 74: Fitting gas outlet casing without support
Product
Size
Tightening torque [Nm]
A150-M58/68
M16
200
Table 49: Tightening torque (51009)
1. Coat thread of bolts (51008) with high-temperature grease.
2. Insert a new gasket (61002) into the gas outlet casing (61001).
3. Fit swivel lifting eyes (S) to the gas outlet casing (61001). Secure lifting gear to the swivel
lifting eye.
4. Place gas outlet casing at turbine casing (51000). Observe the marking.
5. Fit hexagon nuts (51009). Observe the tightening torque.
6. Fit insulation ring. Observe tightening torques (see
).
7. If present: Attach waste gate pipe. Tighten in accordance with enginebuilder’s specifica-
tions.
Page
119
/
179