Operation Manual / TPL67-C.. - TPL71-C..
8 Disassembly and assembly / 8.8 Dismantling and fitting nozzle ring
at turbine end
© Copyright 2020 . All rights reserved.
HZTL2488_EN
Rev.G
March 2020
Qualitative requirements for the nozzle ring area in HFO operation
¡
Coverage of one or more nozzle ring blade pitches by more than 50%
respectively is not permitted.
¡
The surface reduction of the nozzle ring due to contamination may
be no more than 15%.
Assembly
u
Carefully clean grooves and contact surfaces in / on casing and keep
free from metal chips.
u
Keep grooves and spiral-wound gasket free from oil and grease.
1) If provided
u
Fix a
new
spiral-wound gasket (61050) using a little instant adhesive
(for example "Loctite 454 gel") applied at three equally spaced points
in groove.
u
Fit nozzle ring to gas inlet casing and fix it.
u
Fit gas inlet casing.
u
Use guide studs (90320) as a centering aid and remove them after-
wards.
u
Brush screw threads (61044) with high temperature grease.
Segment connection
u
Position segments (51012) using screws (61044).
Checking
Make sure that collars (C) of segments (51012) rest in groove (S).
Flange connection
u
Position screws (61044).
Page
102
/
125