Operation Manual / Power2 850-M / 4.1 Low-pressure stage
4 Disassembly and assembly / 4.10 Removing turbine diffuser and
nozzle ring
© Copyright 2020 ABB. All rights reserved.
HZTL4062_EN
Rev.C
July 2020
Putting down cartridge group onto cover
CAUTION
Damage to cartridge group and toolbox cover
The turned-over toolbox cover may only be used for intermediate storage of
the cartridge group.
u
The cover must be on a level surface.
u
The cover may not be used to transport the cartridge group.
Fig. 14: Putting down cartridge group onto cover
4.10
Removing turbine diffuser and nozzle ring
Fig. 15: Removing turbine diffuser and nozzle ring 1
1. Loosen and remove the screws (61056).
2. Secure connecting flange (90428) to star plate (90414) with screws (90950) and
nuts (90431).
3. Align arm of star plate (90414) marked FRONT in direction of gas outlet flange and screw
star plate to turbine diffuser with screws (90961).
Page
18
/
43