Operation Manual / A150-M56/66/57/67 - A155-M..
9 Dismantling and fitting, general / 9.2 Material required
© Copyright 2022 ABB. All rights reserved.
HZTL4032_EN
Rev.S
February 2022
9.2
Material required
Customer spare part set
Before starting operations, make sure the required customer spare part set is available (see
chapter
Customer tool set
Before starting work, make sure the required tool set is available (see chapter
).
Not all tools are marked with a part number. Identification is guaranteed by the tool list. This
list is enclosed with the tool set.
WARNING
Servicing the tools
The tools must be checked for damage before and after use.
u
Visually inspect for corrosion, cracks, deformation and wear.
u
Damaged tools must no longer be used and must be replaced.
Swivel lifting eyes
Swivel lifting eyes are required for the safe lifting of loads, which are not supplied by Turbo
Systems.
Fig. 39: Swivel lifting eye (example)
Product
Thread M
Length L
Load limit
Quantity
A150
M8
M16
≤ 13 mm
≤ 21 mm
≥ 75 kg
≥ 1000 kg
3
2
A155
M8
M16
≤ 13 mm
≤ 21 mm
≥ 150 kg
≥ 1400 kg
3
2
Table 38: Swivel lifting eyes
Press-off screws
Six press-off screws (01) are required to press off the gas outlet flange, which are not sup-
plied by Turbo Systems.
Page
90
/
198
Summary of Contents for HT612300
Page 2: ......