Operation Manual / A130-H.. - A140-H..
3 Removing and Installing / 3.3 Installing the turbocharger
© Copyright 2021 ABB. All rights reserved.
HZTL4030_EN
Rev.G
July 2021
3.3
Installing the turbocharger
3.3.1
Inserting gaskets into the bracket
CAUTION
Inserting the gaskets
Gaskets that are forgotten, damaged or improperly inserted will lead to oil
leaks.
u
Always use new gaskets and insert them carefully into the slot.
The oil is supplied (02) and drained (03) through the bracket (01).
The necessary sealing is provided by O-rings. The O-rings are not included in the ABB scope
of delivery.
Fig. 15: Inserting gaskets into the bracket
01
Bracket
04
Slot for O-ring
02
Oil supply
05
O-rings
03
Oil drain
06
Pin (optional)
Pin (06) as installation safety device
Turbochargers can have an oil inlet either on their right or left side; the oil inlet position can
be different for the turbocharger fitted on the left and on the right engine bank.
A pin can be installed in every support as an installation safety device to prevent inadvertent
incorrect fitting. This pin fits into the respective slot on the foot of the bearing casing. In-
structions of the enginebuilder must be observed.
Page
33
/
122
Summary of Contents for HT613190
Page 2: ......