Operation Manual / A150-M56/66/57/67 - A155-M..
10 Dismantling and fitting with removed air inlet and gas outlet / 10.12
Installing the cartridge group
© Copyright 2022 ABB. All rights reserved.
HZTL4032_EN
Rev.S
February 2022
Fig. 71: Installing the cartridge group
Product
Size
Tightening torque [Nm]
A150
M16
175
A155
M16
175
Table 50: Tightening torque (51007)
8. Coat the threads of the studs (51006) with high-temperature grease.
9. Align casing position of cartridge group with marking and lower into the turbine casing.
10. Remove lifting gear cross-piece of service support.
11. Install the fastening strips (51002) with Verbus Ripp® washers (51003) and hexagon
nuts (51007). Observe the tightening torque.
Page
121
/
198
Summary of Contents for HT613265
Page 2: ......