Operation Manual / TPS48-D/E.. - TPS61-D/E..
Operation
4
Servicing work
4.2
Page 45
Apr
il 2015
H
ZT
L2410_
EN
R
ev
is
ion
D
Servicing work
4.2
Service work to be carried out during operation involves visual checks,
monitoring, measuring, inspection work and functional checks. It is then
possible for changes to the turbocharger to be identified and rectified. In
this way, it can be ensured that the turbocharger remains in full working
order.
CAUTION
Service intervals
Service work on the turbocharger that is neglected or carried out too
late can lead to excessive contamination and wear as well as operating
failures.
Carry out service work at specified time intervals.
CAUTION
Shortened service intervals
Despite observance of the service intervals, unusual loads, such as
several start-stops a day, harsh environmental factors, poor fuel quality
or heavy installation vibration can lead to premature machine damage.
A shortened service interval must be arranged with ABB Turbo
Systems.
NOTICE
Service inspection after 5 years
To prevent age- and stoppage-related machine damage, an inspection
by an ABB Turbocharging Service Station is recommended at the latest
5 years after the last service.
4.2
© Copyright 2015 ABB. All rights reserved.