Operation Manual / TPS48-D/E.. - TPS61-D/E..
9 Taking out of operation / 9.1 Shutting down the turbocharger
© Copyright 2020 . All rights reserved.
HZTL2410_EN
Rev.F
March 2020
*) Diameter for turbine casing designs for optional C-ring sealing
NOTICE
Information about the turbine casing design (with / without C-ring
sealing) can be requested from an ABB Turbocharging Service Station.
Page
102
/
111