Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30
8 Disassembly and assembly / 8.8 Dismantling and fitting nozzle ring
at turbine end
© Copyright 2020 . All rights reserved.
HZTL2481_EN
Rev.D
March 2020
Flange connection disassembly
u
Remove two hexagon-head screws (61044) together with Verbus
Ripp® washers (61043) from the bottom section and replace them
with two studs (90177).
u
To secure, screw hexagon nuts (90178) onto studs (90177).
u
Loosen and remove the remaining screws (61044) and Verbus Ripp®
washers (61043).
TPL69
u
Pull gas inlet casing (51001) together with nozzle ring (56001) away
from gas outlet casing (61001) until the nozzle ring can be lifted out.
TPL73 – TPL77
u
Pull the gas inlet casing together with nozzle ring away from the gas
outlet casing until holder (90175) can be fitted from the outside using
screws (61044) and Verbus Ripp® washers (61043).
u
Loosen the hexagon nuts (90178) on the studs.
u
Fully withdraw the gas inlet casing and remove it.
CAUTION
Use suitable underlays when putting down gas inlet casing. Take care
not to damage the brackets of the insulation.
1) If present
u
Remove spiral-wound gasket (61050).
TPL73 – TPL77
u
Remove holder (90175) and then nozzle ring (56001).
Page
107
/
134