Operation Manual / TPL65-A10 / -A30
5 Maintenance / 5.3 Cleaning the compressor during operation
© Copyright 2020 . All rights reserved.
HZTL2482_EN
Rev.E
March 2020
u
Push the valve activator (Y) against the spring and hold it for 10 ... 15
seconds until the entire volume of water has been injected.
u
After cleaning, wait at least 5 minutes to allow turbocharger to dry.
NOTICE
If the cleaning operation is not satisfactory, it may be repeated up to
two times.
If the cleaning result is still not satisfactory after three attempts and
the engine values are also unsatisfactory, we recommend that you have
the turbocharger inspected and cleaned by an official ABB Turbochar-
ging Service Station.
Cleaning parameters per turbocharger compressor
Product
Engine load
Contents of water ves-
sel
[dm
3
]
TPL65
50 … 85%
0.4
Page
55
/
117