4
Operation
4.1
Prepare before use
1. Appoint a site operator and an installation engineer, if these are other persons
than you.
2. Make sure that the EVSE is installed according to the instructions in the
installation manual.
3. Make an emergency plan that instructs people what to do in case of an
emergency.
4. Make sure that the manufacturer commissions the EVSE. Contact the
manufacturer when the EVSE is ready for commissioning. Refer to section
Danger:
General risk
•
Make sure that you have approval of the manufacturer to use the
EVSE after commissioning. After approval, do not move the EVSE.
5. Make sure that the space around the EVSE cannot get blocked. Think of snow or
other objects. Refer to the space requirements in section .
.
6. Make sure that maintenance is done on the EVSE. Refer to section
.
4.2
Emergency stop
1. If there is an emergency, push the emergency stop button.
•
The EVSE stops all charge sessions.
•
The LED indicator of the beacon is red.
2. Do not start the EVSE until the situation is safe.
Note: Do not use emergency stop procedure to stop the charge
session, when there is no emergency.
4.3
Reset the EVSE after an emergency stop
1. Make sure that the situation is safe again.
2. Pull out the emergency stop button.
•
The EVSE starts.
•
The LED indicator of the beacon is green.
•
The EVSE resumes the normal operation.
Operation
6AGA000007-0604-EN | 001
21