Commissioning
KNX Technical Reference Manual 1473-1-8905 / 2CKA001473B8905
│20
6
Commissioning
6.1
Software
To start the device a physical address must be assigned first. The physical address is assigned
and the parameters are set with the Engineering Tool Software (ETS).
NOTE
The devices are products of the KNX system and meet KNX guidelines. Detailed
expert knowledge by means of KNX training sessions for a better understanding
is assumed.
6.1.1
Preparation
1. Connect a PC to the KNX bus line via the KNX interface (e.g. via the commissioning
interface / commissioning adapter 6149/21-500).
– The Engineering Tool Software must be installed on the PC (native application from
ETS 4.0).
2. Switch on the bus voltage.
6.1.2
Assigning a physical address
1. Press the programming button [2].
– The red programming LED [1] lights
up.
6.1.3
Assigning the group address(es)
The group addresses are assigned in connection with the ETS.
6.1.4
Selecting the application program
Please contact our Internet support unit (www.BUSCH-JAEGER.com). The application is loaded
into the device via the ETS.
6.1.5
Differentiating the application program
Various functions can be implemented via the ETS.
Detailed description of parameters, see chapter 10 “Description of application and parameters“
on page 24 (only in languages DE, EN, ES, FR, IT and NL).