© 2010 ABB STOTZ-KONTAKT GmbH
75
Note
Purging can also be triggered via the bus with the
communication object
Trigger valve purge
.
After bus voltage recovery and download the purge cycle
continues, the bus failure time – the time for which the bus
actually failed – is not considered.
The purging cycle will restart if
Purge cycle in weeks [1…12]
is changed after the download.
Reset purge cycle
from control value in % [1...99]
Options: 1…99
Hereby, the purge cycle from the set control value is reset.