ABB i-bus
®
KNX
Planning and application
© 2008 ABB STOTZ-KONTAKT GmbH
218
4.2.2.2
Switching
ON and OFF delay
The switching ON and OFF delay delays switch on or switch off of
the output.
The delay time T
D1
or T
D0
starts after a switch command and after it has
timed out the output executes the switch command.
If a new ON telegram with the value 1 is received during the switch on delay,
the time of the switch on delay starts again. The same applies with switch off
for the switch off delay. If a new OFF telegram with the value 0 is received
during the switch off delay, the time of the switch off delay starts again.
Note
If the device receives an OFF command during the switch on delay T
D1
,
an ON command is ignored.