18
The site must be suitable to install the EVSE
—
Table 11: Preliminary requirements
Procedure
1. Make sure that the space and the airflow around the EVSE
are sufficient. Refer to
Table 12: Space requirements for
on this page.
2. Make sure that the correct cables are available at the site:
• AC input cable. Refer to chapter
• RS485 cable. Refer to chapter
• Ethernet cable. Refer to chapter
Prepare the site
Select the site
1. Find a suitable site on a wall. For the specifications
of the wall, refer to
Table 13: Requirements for the wall
on this page.
2. Make sure that the correct power supply is available.
For the power supply specifications, refer to chapter
3. Obey the space requirements. Refer to
on this page.
Z
1
Z
2
EVSE
Parameter
Specification
[in]
[mm]
Z1
> 8
> 200
Z2 (indoor use)
18 to 48
450 to 1200
Z2 (outdoor use)
24 to 48
600 to 1200
—
Table 12: Space requirements for installation
Parameter
Specifications
Wall thickness
Minimum 4.72 in (120 mm)
Wall strength
The wall must be serviceable for the items listed below:
1. The weight of the EVSE. Refer to chapter
2. The torque for the mounting screws. Refer to chapter
Wall material
The mounting surface must be flat and stable, for example a finished, brick or concrete wall
—
Table 13: Requirements for the wall
—
Site preparation