Page 4
© 2021 ABB. All rights reserved.
QUICK START GUIDE
A + B = 20 for
19”
distribution
= 26 for
23”
distribution
Direct Battery Connections are on
23”
systems only.
Lug Landings
Distribution
Battery Bus
Two multi
-
pole adapters are required for each multi
-
pole breaker
-
figure below.
Move plastic slider for Battery or
Load (Battery shown)
Upper Breaker position for Battery
Lower Breaker position for Load
Correct Breaker orientation for insertion
Alarm Pin
Load Return Connections
(Bus behind Load Connections)
Return Bus Adapters
Face lug studs to the rear.
Load Connections