Note
Action
xx2200000541
Access and reconnect the connector from the
swing top.
•
MP2
Tip
See the number markings on the connectors for
help to find the corresponding connector.
7
Routing the cable package in axis 2
Note
Action
Route and secure the cabling with cable straps.
CAUTION
Correct cable routing is highly important.
If the cables are routed and secured incorrectly
the cables can be damaged.
1
Grease: 3HAC029132-001
Apply grease to the cable package, cover all
moving area of the package.
2
Cable bracket, axis 2:
3HAC080837-001
Refit the axis-2 cable bracket.
3
Screw: M2x6 12.9 (2 pcs)
Tightening torque: 0.4 Nm
xx2200000063
Refitting the swing top cover
Note
Action
Make sure the axis 2 is in -60° position; otherwise,
connect the power supply to axis-2 motor and re-
lease the axis-2 brake to move the axis 2 to -60°.
Then, disconnect the power supply.
Note
The robot is not connected to the controller during
replacement, power must be supplied to the con-
nector R1.MP according to the section
power to connector R1.MP on page 56
.
1
Continues on next page
142
Product manual - IRB 1010
3HAC081964-001 Revision: B
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.3.1 Replacing the cable package
Continued
Summary of Contents for IRB 1010
Page 1: ...ROBOTICS Product manual IRB 1010 ...
Page 8: ...This page is intentionally left blank ...
Page 14: ...This page is intentionally left blank ...
Page 36: ...This page is intentionally left blank ...
Page 46: ...This page is intentionally left blank ...
Page 80: ...This page is intentionally left blank ...
Page 306: ...This page is intentionally left blank ...
Page 312: ...This page is intentionally left blank ...
Page 326: ...This page is intentionally left blank ...
Page 328: ...This page is intentionally left blank ...
Page 332: ......
Page 333: ......