4.2.2 Maintenance schedule
Scheduled and non-predictable maintenance
The robot must be maintained regularly to ensure proper function. The maintenance
activities and intervals are specified in the table below.
Non-predictable situations also give rise to inspections of the robot. Any damages
must be attended to immediately!
Life of each component
The inspection intervals
do not
specify the life of each component. Values for these
are specified in the section
Expected component life on page 85
Maintenance schedule
Reference
Every
30,000
hours
ii
Every
36
months
Every
12
months
Regularly
i
Maintenance activities
Cleaning the IRB 1010 on page 86
x
Cleaning the robot
Check for abnormal wear or
contamination.
x
Inspecting the robot
Inspecting the information labels
x
Inspecting the information labels
Inspecting the robot cabling on
x
iii
Inspecting the robot harness
Inspecting timing belts on page 91
x
Inspecting the timing belt
Inspecting mechanical stops on
x
Inspecting the mechanical stop
Lubricating the cable package on
x
iv
Lubricating the robot harness
x
v
Replacing the SMB battery pack
Recommended to robots without
the SafeMove option. See
Operating manual - OmniCore
.
x
vii
Running the
Brake Check
routine
vi
x
Overhaul of complete robot
i
"Regularly" implies that the activity is to be performed regularly, but the actual interval may not be
specified by the robot manufacturer. The interval depends on the operation cycle of the robot, its
working environment and movement pattern. Generally, the more contaminated environment, the
shorter intervals. The more demanding movement pattern (sharper bending cable harness), the
shorter intervals.
ii
Operating hours counted by the DTC = Duty time counter.
iii
Replace when damage or cracks is detected or life limit is approaching.
iv Replace when damage or cracks is detected or life limit is approaching.
v
The battery is to be replaced at given maintenance interval or at battery low alert.
Continues on next page
Product manual - IRB 1010
83
3HAC081964-001 Revision: B
© Copyright 2022 ABB. All rights reserved.
4 Maintenance
4.2.2 Maintenance schedule
Summary of Contents for IRB 1010
Page 1: ...ROBOTICS Product manual IRB 1010 ...
Page 8: ...This page is intentionally left blank ...
Page 14: ...This page is intentionally left blank ...
Page 36: ...This page is intentionally left blank ...
Page 46: ...This page is intentionally left blank ...
Page 80: ...This page is intentionally left blank ...
Page 306: ...This page is intentionally left blank ...
Page 312: ...This page is intentionally left blank ...
Page 326: ...This page is intentionally left blank ...
Page 328: ...This page is intentionally left blank ...
Page 332: ......
Page 333: ......