Note
Action
xx2200000086
Pull out the cable package up through the pointed
hole in the axis-1 assembly unit and then pull it
out completely.
3
xx2200000087
Refitting the cable package
Use these procedures to refit the cable package.
Securing the cable package to the axis-1 assembly unit
Note
Action
Wrap the connectors with the masking tape.
1
xx2200000087
Insert the cable package into the axis-1 assembly
unit through the pointed hole.
CAUTION
Note the correct direction of the cable package.
Make sure that no cables or hoses are twisted or
strained. Reroute if necessary.
2
Cable protector, axis 1:
3HAC078560-001
Refit the axis-1 cable protector.
3
Screw: M2.5x6 12.9 Lafre
2C2B/FC6.9 (3 pcs)
Tightening torque: 0.4 Nm
xx2200000084
Continues on next page
132
Product manual - IRB 1010
3HAC081964-001 Revision: B
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.3.1 Replacing the cable package
Continued
Summary of Contents for IRB 1010
Page 1: ...ROBOTICS Product manual IRB 1010 ...
Page 8: ...This page is intentionally left blank ...
Page 14: ...This page is intentionally left blank ...
Page 36: ...This page is intentionally left blank ...
Page 46: ...This page is intentionally left blank ...
Page 80: ...This page is intentionally left blank ...
Page 306: ...This page is intentionally left blank ...
Page 312: ...This page is intentionally left blank ...
Page 326: ...This page is intentionally left blank ...
Page 328: ...This page is intentionally left blank ...
Page 332: ......
Page 333: ......