iii
Axis-1 and axis-4 timing belts can be accessed and inspected only after the axis-1 and axis-4
motors are removed. It is recommended to inspect the timing belts when replacing the motors.
iv Replace when damage or cracks is detected or life limit is approaching.
v
Replace when damage or cracks is detected or life limit is approaching.
vi The battery is to be replaced at given maintenance interval or at battery low alert.
vii Not needed separately if already included in the application.
viii Recommended test interval is within the range 8-48 hours.
96
Product manual - IRB 1100
3HAC064992-001 Revision: L
© Copyright 2019-2022 ABB. All rights reserved.
4 Maintenance
4.2.2 Maintenance schedule
Continued
Summary of Contents for IRB 1100
Page 1: ...ROBOTICS Product manual IRB 1100 ...
Page 8: ...This page is intentionally left blank ...
Page 16: ...This page is intentionally left blank ...
Page 38: ...This page is intentionally left blank ...
Page 50: ...This page is intentionally left blank ...
Page 738: ...This page is intentionally left blank ...
Page 760: ...This page is intentionally left blank ...
Page 764: ......
Page 765: ......