Information
Action
21
Clean Room robots: seal and paint the joints
that have been opened. See
Note
After all repair work, wipe the robot free
from particles with spirit on a lint free cloth.
22
Refitting the cable harness in the
upper arm housing
Use this procedure to refit the cable harness in the
upper arm housing
.
Information
Action
Clean Room robots: clean the joints that
have been opened. See
1
Reconnect connectors:
•
R2.MP4
•
R2.ME4.
2
Fasten motor cables with a cable tie.
3
Tightening torque: 1 Nm.
xx0900001023
Fasten the cable harness with cable ties on
the cable bracket. Adjust the lenght on the
cable harness so the motor cables reaches
its connectors.
4
Parts:
•
A: Cable bracket
•
B: Cable bracket
Push the
cable harness
in through the
wrist
housing
.
5
Continues on next page
Product manual - IRB 120
141
3HAC035728-001 Revision: N
© Copyright 2009-2017 ABB. All rights reserved.
4 Repair
4.3.2 Refitting the cable harness
Continued
Summary of Contents for IRB 120
Page 1: ...ROBOTICS Product manual IRB 120 ...
Page 8: ...This page is intentionally left blank ...
Page 90: ...This page is intentionally left blank ...
Page 114: ...This page is intentionally left blank ...
Page 224: ...This page is intentionally left blank ...
Page 250: ...This page is intentionally left blank ...
Page 254: ...This page is intentionally left blank ...
Page 264: ...This page is intentionally left blank ...
Page 270: ......
Page 271: ......