Information
Action
A
B
xx0900000879
Unscrew the
attachment screws
securing
the
cable bracket
.
7
Parts:
•
A: Cable bracket
•
B: Attachment screws (2 pcs)
Move the
cable harness
a little to the side.
8
Unscrew the
attachment screws
securing
the
motor axis 3
.
9
xx0900000876
Remove the
timing belt
from the
pulleys
on
the motor axis.
10
Parts:
•
A: Timing belt
•
B: Pulleys (2 pcs)
Remove the motor.
11
Refitting axis-3 motor
Use this procedure to refit axis-3 motor.
Information
Action
Clean Room robots: clean the joints that
have been opened. See
1
Continues on next page
Product manual - IRB 120
205
3HAC035728-001 Revision: N
© Copyright 2009-2017 ABB. All rights reserved.
4 Repair
4.7.3 Replacing axis-3 motor with gearbox
Continued
Summary of Contents for IRB 120
Page 1: ...ROBOTICS Product manual IRB 120 ...
Page 8: ...This page is intentionally left blank ...
Page 90: ...This page is intentionally left blank ...
Page 114: ...This page is intentionally left blank ...
Page 224: ...This page is intentionally left blank ...
Page 250: ...This page is intentionally left blank ...
Page 254: ...This page is intentionally left blank ...
Page 264: ...This page is intentionally left blank ...
Page 270: ......
Page 271: ......