Note
Action
xx2000001741
Remove the tilt unit.
3
Refitting the tubular and tilt unit (IRB 1300-11/0.9 and IRB 1300-10/1.15)
Use these procedures to refit the tubular and tilt unit for IRB 1300-11/0.9 and IRB
1300-10/1.15.
Checking the sealing set on the tilt unit (Foundry Plus)
Note
Action
For robots with protection type Clean Room:
1
Clean the joints that have been opened and wipe
the parts free from particles with spirit on a lint
free.
xx2000002489
Check the sealing set on the tilt unit.
The sealing set includes an inner ring cover (A),
a radial sealing (B), an outer ring cover (C) and a
gasket (D).
Replace the damaged part as described below:
•
If the inner ring cover is damaged, proceed
to
.
•
If the radial sealing is damaged, proceed
to
.
•
If the outer ring cover is damaged, proceed
to
.
•
If the gasket is damaged, proceed to
.
2
xx2000002490
Remove the old inner ring cover and fit the new
one with two M3x8 countersunk screws.
3
Continues on next page
Product manual - IRB 1300
447
3HAC070390-001 Revision: G
© Copyright 2020-2022 ABB. All rights reserved.
5 Repair
5.5.3 Replacing the tubular and tilt unit
Continued
Summary of Contents for IRB 1300
Page 1: ...ROBOTICS Product manual IRB 1300 ...
Page 8: ...This page is intentionally left blank ...
Page 36: ...This page is intentionally left blank ...
Page 100: ...This page is intentionally left blank ...
Page 746: ...This page is intentionally left blank ...
Page 762: ...This page is intentionally left blank ...
Page 764: ...This page is intentionally left blank ...
Page 768: ......
Page 769: ......