Note
Action
Note
Draining is time-consuming.
Elapsed time varies depending on the
temperature of the oil.
Drain the gearbox oil.
7
Remove the quick coupling connector and
clean the pipe after the oil is drained.
Note
There will be some oil left in the gearbox
after draining.
8
Tightening torque: 10 Nm
Refit oil plugs.
9
Removing the complete cable package
Follow the instructions detailed in
Removing the cable package on page 155
to
remove the complete cable package.
Putting the robot on its side
Note
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
CAUTION
For robots with protection type Clean Room
Always cut the paint with a knife and grind the
paint edge when disassembling parts of the robot!
See
Cut the paint or surface on the robot before
2
Roundsling, 1.7 m (1 pcs), Lifting
capacity: >400 kg
xx2000001651
Run a roundsling around the lower arm.
3
Continues on next page
Product manual - IRB 1300
499
3HAC070390-001 Revision: G
© Copyright 2020-2022 ABB. All rights reserved.
5 Repair
5.6.1 Replacing the axis-1 motor
Continued
Summary of Contents for IRB 1300
Page 1: ...ROBOTICS Product manual IRB 1300 ...
Page 8: ...This page is intentionally left blank ...
Page 36: ...This page is intentionally left blank ...
Page 100: ...This page is intentionally left blank ...
Page 746: ...This page is intentionally left blank ...
Page 762: ...This page is intentionally left blank ...
Page 764: ...This page is intentionally left blank ...
Page 768: ......
Page 769: ......