4.2.2 Maintenance schedule
Scheduled and non-predictable maintenance
The robot must be maintained regularly to ensure proper function. The maintenance
activities and intervals are specified in the table below.
Non-predictable situations also give rise to inspections of the robot. Any damages
must be attended to immediately!
Life of each component
The inspection intervals
do not
specify the life of each component. Values for these
are specified in the section
Expected component life on page 105
Maintenance schedule
Reference
Every
30,000
hours
ii
Every
24,000
hours
Every
12,000
hours
Every
36
months
Every
12
months
Regularly
i
Maintenance activities
x
Cleaning the robot
Check for abnormal wear or
contamination.
For robots with protection type
Clean Room: Inspect daily
x
Inspecting the robot
Inspect the oil level in the
actual gearbox if there is a
suspected leakage, after an oil
change or a maintenance or
repair activity where draining
and filling oil is required.
x
Inspecting the oil level in gearboxes
x
Inspecting the information labels
x
iii
Inspecting the robot harness
x
Inspecting the mechanical stop
x
Inspecting the timing belt
x
iv
Lubricating the robot harness
x
v
Replacing the SMB battery pack
Continues on next page
Product manual - IRB 1300
103
3HAC070390-001 Revision: G
© Copyright 2020-2022 ABB. All rights reserved.
4 Maintenance
4.2.2 Maintenance schedule
Summary of Contents for IRB 1300
Page 1: ...ROBOTICS Product manual IRB 1300 ...
Page 8: ...This page is intentionally left blank ...
Page 36: ...This page is intentionally left blank ...
Page 100: ...This page is intentionally left blank ...
Page 746: ...This page is intentionally left blank ...
Page 762: ...This page is intentionally left blank ...
Page 764: ...This page is intentionally left blank ...
Page 768: ......
Page 769: ......