Safety risks related to end effectors
6.1 Gripper
If grippers are used to hold workpieces, inadvertent loosening of the workpiece must be
prevented.
6.2 Tools, workpieces
It must be possible to turn off tools like mill cutters, etc., in a safe and sure manner, e.g.
run down timers can ensure guards remain closed until cutters stop rotating.
Grippers must be so designed that the workpiece is retained in the event of an energy
failure or disturbances in the control system. It should be possible to release parts by
manual operation (valves).
6.3 Pneumatic, hydraulic:
Special safety regulations apply to pneumatic and hydraulic systems.
After shut-down, attention should be paid to residual energy in these system.
The pressure in pneumatic and hydraulic systems must be released before repair work is
commenced on them. Gravity may cause any parts or objects which are held by these
systems to drop. Dump valves should be used in case of emergency. Shot bolts should be
used to prevent tools, etc., from falling due to gravity.
Actions during operation disturbances
Disturbances in the working process entail other risks besides those associated with
regular operation, since such disturbances can necessitate rectification by hand.
Such rectification must be carried out by trained personnel only, who must be familiar
with the entire installation as well as the special risks associated with different
parts of it.
The industrial robot is flexible for use in different industrial applications. Caution must
always be observed and all work must be carried out to a professional standard and in
accordance with applicable safely regulations.
Safety 1KB 2000 1KB 3000
9 1KB 3200 1KB 6000
Summary of Contents for IRB 2000
Page 8: ...Description 1KB 2000 ...
Page 10: ...Description 1KB 2000 ...
Page 12: ...Description 1KB 2000 6 ...
Page 20: ...Description 1KB 2000 14 ...
Page 32: ...Description 1KB 2000 26 ...
Page 40: ...5 3 2 Dimensional drawings Description 34 1KB 2000 ...
Page 41: ..._200 _D D_ Description 35 1KB 2000 ...
Page 44: ...Description 1KB 2000 38 ...
Page 64: ...Description 1KB 2000 58 ...
Page 77: ...Safety 1KB 2000 IBB 3000 12 1KB 3200 1KB 6000 ...
Page 80: ...Installation H B 2000 ...
Page 82: ...Installation 1KB 2000 ...
Page 91: ...Installation 1KB 2000 12 ...
Page 95: ...Installation 1KB 2000 16 ...
Page 110: ...INSTALLATION S3 0 4 ...
Page 112: ...INSTALLATION S3 1 2 ...
Page 160: ...INSTALLATION 3 46 ...
Page 234: ...INSTALLATION 5 70 ...
Page 262: ...INSTALLATION S3 7 6 ...