3 Maintenance
3.1.2. Regular Maintenance
3HAC030005-001 Revision: -
74
©
Copyri
ght 200
6 ABB
.
All ri
ghts res
erved.
3.1.2. Regular Maintenance
Recommendation
The robot is designed to be able to work under very demanding conditions with a minimum
of maintenance. Time between services can vary depending on the influence of the
environment the robot is exposed for. We strongly recommend that at every stop in production
and after every wash down, the robot is inspected concerning the following parts:
Nevertheless, certain routine checks and preventative maintenance must be carried out at
specified periodic intervals, as shown in the table below.
Inspect regularly:
Note.
Telescopic shaft
Spring Units
Bars
Universal Joints
Preventative Maintenance
Note.
The robot should be cleaned.
As described in section
Cleaning of Robot Standard
and Wash Down on page 105
.
Check that the sealing joints and cable glands are really
airtight so that dust and dirt are not sucked into the cabinet.
Lubricate sealings at regular intervals and when needed,
recommended lubrication
.
Summary of Contents for IRB 360/3
Page 1: ...Product manual Parallel robot IRB 360 IRB 360 3 IRB 360 1 800 M2004 ...
Page 2: ......
Page 8: ...Table of Contents 6 3HAC030005 001 Revision Copyright 2008 ABB All rights reserved ...
Page 246: ...Index 232 3HAC030005 001 Revision Copyright 2008 ABB All rights reserved ...
Page 247: ......