3 Maintenance
3.3.6. Joint Balls
3HAC030005-001 Revision: -
86
©
Copyri
ght 200
6 ABB
.
All ri
ghts res
erved.
3.3.6. Joint Balls
General
This section describes maintenance on the joint Balls, with interval 4000 hour.
DANGER!
Turn off all electrical power, hydraulic and pneumatic pressure supplies to the robot!
Also read the safety sections:
•
Safety risks related to pneumatic/hydraulic systems on page 18
•
Risks associated with live electric parts on page 20
•
Safety risks during installation and service work on robot on page 15
Check joint balls
xx0700000500
Required Equipment and References
Interval 4,000 hrs or 2 Years
A
Movable Plate
B
Joint Balls
Required Equipment
Spare part no.
Note
Standard tools
Pliers for Parallel Arms
3HAC6194-1
References
Replacement of Joint Balls on page 138
Action
Note
1. Check surface of joint balls for cracks or burrs.
If necessary replace the part as
described in
Summary of Contents for IRB 360/3
Page 1: ...Product manual Parallel robot IRB 360 IRB 360 3 IRB 360 1 800 M2004 ...
Page 2: ......
Page 8: ...Table of Contents 6 3HAC030005 001 Revision Copyright 2008 ABB All rights reserved ...
Page 246: ...Index 232 3HAC030005 001 Revision Copyright 2008 ABB All rights reserved ...
Page 247: ......