2 Installation and Commissioning
2.4.4. Orienting and securing the robot cage
45
3HAC030005-001 Revision: -
©
Copyri
ght 200
6 ABB
.
All ri
ghts res
erved.
Orienting and securing
Shim Drawing
Example of shim.
xx0700000623
Chemical bolts or Mechanical
Expanding bolts.
Standard Tools
References
Pre-installation procedure on page 33
Equipment
Spare/ Part No.
Note
Action
Note
1. Make sure the installation site for the robot conforms
to the specifications in section
2. Prepare the installation site.
3. Use a Water level to level the robot cage.
Use shim for leveling. Example of
shim shown in
4. Secure the robot cage to the floor.
Use Chemical or Mechanical
Expander bolts.
Continued
Summary of Contents for IRB 360/3
Page 1: ...Product manual Parallel robot IRB 360 IRB 360 3 IRB 360 1 800 M2004 ...
Page 2: ......
Page 8: ...Table of Contents 6 3HAC030005 001 Revision Copyright 2008 ABB All rights reserved ...
Page 246: ...Index 232 3HAC030005 001 Revision Copyright 2008 ABB All rights reserved ...
Page 247: ......